Project Roadmap

From protected concept to industrial validation.

The immediate objective is to generate credible experimental proof, protect the intellectual property, and prepare the technology for an industrial pilot.

Current status

Pre-seed, protected and ready for validation.

The next financing round will fund laboratory work, prototype engineering and recruitment of the core technical team.

Initial reactor concept and system architecture developed
Rotating thin-film electrolysis and paired-chemistry platform defined at a non-enabling level.
First commercial application selected
Hydrogen and benzaldehyde co-production identified as the initial validation and market-entry case.
Preliminary process and engineering studies completed
Initial mass and energy balances, development steps and critical proof points established.
Priority patent application filed
A priority application has been filed Europe.
Experimental roadmap prepared
Laboratory chemistry validation, flow-cell screening and rotating thin-film prototype testing planned.
Near-term roadmap

Technical and commercial milestones.

Initial experimental work is planned using relevant laboratory capabilities in Estonia, including potential cooperation with Academic partner.

0–6 months

Chemistry validation

Confirm benzaldehyde selectivity and hydrogen co-production in a laboratory divided cell.

6–15 months

Prototype development

Design, build and test the first rotating thin-film reactor and compare it with benchmark electrolysis.

12–24 months

Pilot preparation

Integrate product recovery, safety and controls, complete a preliminary TEA and secure an industrial pilot partner.